Bonus content

Don't forget the exterior

It is easy to pour the whole budget into the kitchen and bathrooms and forget the first thing everyone sees. The exterior is where kerb appeal and resale value live, and tying it into the renovation from the start is far cheaper than coming back to it later. This is how to bring the outside of your home along with the inside.

Save this
  • Put the exterior in the brief from the start, not after the budget runs out
  • A fresh, consistent colour scheme is the highest-value, lowest-cost change
  • Run power, water, and gas for outdoor living before the ground is closed up
  • Sort drainage first, and check whether facade changes need approval
01

Break it down

FacadeCladding, render, paint, windows, doors, roof, and the garage door.
EntryThe front door, a sheltered threshold, house numbers, and entry lighting.
LandscapingPaths, driveway, and paving, softened with planting and fencing.
Outdoor livingA deck, alfresco, or outdoor kitchen, with services run in early.
Drainage and servicesExternal power and water points, security, and getting water away from the house.
ApprovalsFacade, setback, fencing, and heritage changes can need council consent.
Garden lightingEntry, path, and garden lights, warm and wired at rough-in, so the house reads as one piece after dark.
02

Bring the outside along with the inside

Treat the exterior as part of the brief

Decide early how much of the outside is in scope. Even if a full facade change is beyond this project, small, coordinated moves, paint, a new front door, updated lighting, and tidy landscaping, lift the whole home and protect the value of everything you have done inside.

Work through the facade

Cladding, render, and paint set the character of the home, and a fresh, consistent colour scheme is one of the highest-value, lowest-cost changes you can make. Windows, doors, the garage door, and the roof are the bigger-ticket items, so decide which are in scope now and which are staged for later, and make sure the styles you choose work together rather than fighting.

03

Exterior colour scheme

Build the scheme in three parts: a dominant wall colour, a roof and gutter colour that anchors it, and a trim colour for windows, fascia, and posts. Keep the palette to those three, then let the front door carry the accent.

The three-part scheme
WallsDominant
One colour across the cladding or render
RoofAnchor
Roof and gutters that anchor it
TrimOutline
Windows, fascia, posts
DoorAccent
The front door
Three colours plus an accentWalls carry the dominant colour, the roof and gutters anchor it, trim outlines the openings, and the door takes the accent
04

Cladding and materials

Match the material to the era and form of the home first, then to the budget.

Weatherboard

Timber or fibre-cement boards with the classic horizontal shadow line.

CostMid
MaintenanceRepaint every eight to ten years; timber needs more care than fibre cement
SuitsCottages, coastal homes, character streets
Brick

Face brick is the lowest-upkeep facade in the country, and paint or bagging can renew it.

CostHigher to lay, lowest to keep
MaintenanceMinimal; mortar is repointed over decades
SuitsMost eras; paint or bag for a newer look
Render

A trowelled finish over masonry or foam that reads clean and contemporary.

CostMid
MaintenanceRepaint and patch hairline cracks as they appear
SuitsContemporary and Mediterranean forms
Fibre cement panels

Large sheets with expressed joints for a crisp, modern face.

CostBudget to mid
MaintenanceLow; holds paint well
SuitsModern additions and exposed coastal sites
05

The details that lift the whole home

Make the entry count

The front door, a portico or a simple sheltered threshold, clear house numbers, and good entry lighting do a lot of work for a little money. This is the handshake of the home, so it is worth getting right.

Plan the landscaping and outdoor living

Hardscaping, the paths, driveway, and paving, gives you the structure, and planting softens it. If a deck, alfresco, or outdoor kitchen is on the wish list, plan the services for it now, because running power, water, and gas out there is far cheaper before the ground and walls are closed up.

06

High impact now, staged for later

Split the exterior wish list by payback. The left column transforms the street view for a few thousand dollars; the right column waits for its own budget without hurting the result.

High impact now
PaintA fresh, consistent scheme across walls and trim
EntryA new or repainted door, hardware, numbers, and a light
GardenMulched beds, clean edges, and a tidy path
Staged for later
RoofRecolour or replace when it reaches the end of its life
WindowsUpgrade room by room as the budget allows
Garage doorReplace when due, colour-matched to the scheme
07

Outdoor living services

If a deck, alfresco, or outdoor kitchen is on the wish list, run its services while the trenches are open: a couple of double GPOs, a tap, gas if you will cook outside, and a spare conduit for future lighting. The trench costs little now and thousands later.

Run it before the ground closesPower, water, and gas reach the outdoor zone while the walls and paving are still open
08

Drainage basics

Water is the exterior's quiet enemy. Gutters and downpipes must reach the stormwater system, not just the ground beside the house, and paths and garden beds should fall away from the walls so rain never sits against the slab or stumps. Poor drainage can undermine everything else you have paid for, so it belongs on the plan, not in the too-hard basket.

Away from the houseRoof water is piped to stormwater and the ground surface falls away from the walls
09

Exterior lighting

Outdoor lighting is three small layers, wired at rough-in and switched sensibly. Keep every fitting warm, 2700 to 3000 K, so the house reads as one piece after dark.

EntryA wall light or two at the door on a sensor or timer, bright enough to find the lock and read the number
PathsLow bollards and step lights where levels change, aimed at the ground rather than the eyes
SecuritySensor floods at the garage and side paths, wired rather than solar where possible
10

Check what needs approval

Changes to the facade, the front setback, fencing, or anything on a heritage-listed or character home can need council approval, and the rules differ by state and council. Confirm the approval pathway before you commit to a big external change.

Often exempt or minor
PaintRepainting in similar tones on a non-heritage home
RepairsLike-for-like repairs to cladding, gutters, and fences
GardenPlanting, mulch, and low garden edging
FixturesHouse numbers, letterboxes, and small lights
Usually needs consent
FacadeChanging cladding, windows, or the roofline
Front boundaryFences over the height limit and new driveways
StructuresCarports, garages, decks, and pergolas beyond exempt sizes
HeritageAlmost any visible change on a listed or character home
In a strata townhouse the facade, roof, and front garden are usually common property, so the scheme must approve changes before the council does.
Strata / OC / CTS
11

Brief your builder

Put the exterior in the contract as line items, not an allowance:

The exterior scope named: paint, entry, landscaping, and what is staged for later
The colour scheme locked as roof, walls, trim, and door, tested on the wall in daylight
Power, water, gas, and spare conduit run to outdoor zones before the ground closes
Gutters, downpipes, and surface falls connected to stormwater and signed off
12

Common mistakes

Leaving the exterior as an afterthought, then running out of budget for it
A facade colour or style that clashes with the era and form of the home
Forgetting external power and water points, so the yard is hard to use
Ignoring drainage until water becomes a problem
Assuming external changes never need approval

Renovation Roadmap

Upgrade to unlock everything

Upgrade to the full Renovation Roadmap membership for the complete guide and full toolkit.

Complete renovation guide

Complete renovation guide

Nine stage-by-stage chapters that carry you through the whole build, from first plans to final handover.

Explore the renovation guide
Full toolkit

Full toolkit

Every checklist, template, and tracker you need to stay on top of cost, compliance, and trades.

See what is in the toolkit
See pricing and upgrade →
Important notice: This content provides general guidance only and does not constitute legal, financial, structural, or building advice. Requirements, regulations, approval processes, and building standards vary significantly between Australian states and territories and change over time. Verify all requirements with your state authority and engage licensed professionals for all certified works.