Electrical plans
Power is the one thing you cannot easily change once the walls close up. Deciding where every point, switch, and outlet goes before 'rough-in' is the difference between a home that works around you and one you work around for a decade. This is how to plan it, room by room.
- Settle the electrical plan before 'rough-in', you cannot move a point once the walls are lined
- Aim for a double 'GPO' for roughly every metre of usable bench
- Check the switchboard has capacity, and plan a 'dedicated circuit' for the oven and cooktop
- Walk the site and sign off every point and switch before the plaster goes on
Plan power before the walls close
The cost of a change climbs fast
Moving a single point costs almost nothing on paper, a little at 'rough-in', and a lot once the walls are lined and painted. Decide early and you avoid the expensive end entirely.
- A double point per metre of bench
So the kettle, toaster, and charger are not competing for one outlet. The most common kitchen regret.
- Dedicated circuits for big loads
An induction cooktop and oven each need a 'dedicated circuit', and an older switchboard may need an upgrade to carry them.
Go room by room
Stand in each room and picture the daily routine before you place a single outlet. Plan for how you will actually live in the space, not for an empty floor plan.
Heights and positions
- Light switch1000–1100 mmfrom the floor
- Bench pointAbove the splashback
- Power point300 mmfrom the floor
Typical positions only. Most heights are not fixed by the wiring rules, so agree the final setout with your electrician and match any existing switches in the home.
Switching, data, and the future
Control hallway and stair lights from both ends, so you are never walking through the dark.
Dimmers where you want to set a mood, and sensor lights for the pantry, robe, or entry.
Wired data and television points where you need them, and USB or USB-C outlets at key spots.
Rough in a provision for an EV charger or a solar and battery setup now, far cheaper than retrofitting.
The switchboard
The switchboard is the heart of the plan, and older homes often cannot take what a renovation adds. A board with ceramic fuses or no spare ways needs an upgrade before new circuits can land, and your electrician will check the mains capacity if you are adding induction, air conditioning, or an EV circuit.
An upgrade swaps the board for circuit breakers with safety switches, usually done in a day with the power off. It is also the moment to have every circuit labelled properly, a small job you will thank yourself for at the first tripped breaker.
- FusesCeramic fuses instead of circuit breakers
- CapacityNo spare ways left for new circuits
- LoadsInduction, air conditioning, or an EV circuit arriving
- SafetyNo safety switches protecting existing circuits
Safety switches and compliance
A safety switch (RCD) cuts the power in milliseconds when current leaks to earth, and every new or altered circuit in a renovation must be protected by one. They sit in the switchboard beside the breakers; press the built-in test button twice a year.
All of this is licensed work, no exceptions. At completion your electrician must give you a certificate of compliance for the electrical work; file it with your renovation records.
Remember
The rough-in walk-through
Before the walls are lined, walk the site with your plan. This is your one chance to catch a missing bedside point or a switch that will end up behind an open door.
Check every power point, switch, and outlet is where the plan says it should be
Confirm the mounting heights, and that no switch will end up behind an open door
Verify the data, TV, and USB points, and the dedicated circuits for the oven and cooktop
Sign off the rough-in in writing, and ask the electrician to photograph it before the plaster goes on
Electrical in an apartment
Strata / OC / CTSIn an apartment the switchboard may sit inside your lot while the mains and risers are common property, so adding capacity is not always within your control. New circuits, air conditioning, and anything that penetrates a wall or the slab usually needs scheme approval before work starts.
Book the building manager early if power to the floor must be isolated, and confirm any after-hours work rules before the electrician prices the job.
Remember
Brief your electrician
Put the plan in writing before the quote, so you are comparing prices on the same scope:
- Every point, switch, and data run marked on a plan, room by room
- Dedicated circuits listed: oven, induction, air conditioning, and the EV provision
- Switchboard capacity confirmed in the quote, with any upgrade priced as a line item
- The rough-in walk-through booked before plaster, and the certificate of compliance at handover
Common mistakes
Related content
Renovation Roadmap
Upgrade to unlock everything
Upgrade to the full Renovation Roadmap membership for the complete guide and full toolkit.
Copyright © 2026 Renovation Roadmap. Unauthorised use and/or duplication of this material without express and written permission from this site’s author and/or owner is strictly prohibited.