Bathroom layout and waterproofing basics

A bathroom is the most technical room in the house, and the most expensive to get wrong. The two things that decide whether it works for decades are the layout and the waterproofing, and both are settled before the pretty finishes go in.

Save this
  • Settle the layout, clearances, and door swing before you choose fixtures
  • Separate the wet zone from the dry zone so the whole room does not soak
  • Waterproofing is a regulated, certified step, not a finish, get it signed off
  • Plan the 'falls to waste' and the exhaust before tiling starts
01

Layout and clearances

Clearances, sightlines, and zones

Plan the layout before any fixture is chosen. Leave comfortable clearance in front of the toilet and vanity, keep the toilet out of the direct sightline from the door, and make sure the door, including a shower door, opens without hitting anything. Separate the wet zone, the shower and bath, from the dry zone, the vanity and toilet, so the whole room does not get soaked in daily use.

Clearance in front
Leave comfortable standing room in front of the toilet and vanity
Sightline and door swing
Keep the toilet off the sightline from the door, and let every door swing clear
Wet and dry zones
Separate the shower and bath from the vanity and toilet so the room does not soak
Common arrangements
  • In a smaller bathroom, line the fixtures along one wall to keep the plumbing simple and the cost down
  • In a larger room, split the wet and dry zones across the space, or separate the toilet, for a more comfortable result
  • Keep plumbing runs sensible: grouping fixtures on shared walls is cheaper and easier than spreading them around the room
02

Dimensions cheat sheet

Set these before fixtures are ordered; they decide whether the room passes a walk-through without elbows hitting glass.

900 × 900
Minimum comfortable shower in mm
600 mm
Clear space in front of toilet and vanity
850–900
Vanity height in mm
900–1200
Niche band height in mm above floor
2000 mm
Standard screen height
1:50
Fall across the shower floor
03

Waterproofing and moisture

Waterproofing is a certified step, not a finish

Waterproofing in Australian bathrooms is governed by the relevant standard and is a regulated part of the build, not a coat you brush on for looks. A licensed waterproofer applies the membrane to the specified areas, the floor is graded so water runs to the 'floor waste', and the work is documented and certified. Failed or skipped waterproofing is one of the most expensive defects to fix, because it means pulling the finished room apart.

04

Ventilation

A sealed, poorly ventilated bathroom grows mould no matter how good the waterproofing is. Specify an exhaust fan sized to the room and vented outside, not just into the ceiling cavity, and run it long enough after showers to clear the moisture. Good ventilation protects the finishes, the paint, and the air quality.

Size the fan to the room rather than buying whatever the sparkie has on the van: for a typical domestic bathroom, aim for a unit that changes the air fifteen to twenty times an hour, and duct it to outside air.

Ducted outsideThe exhaust vents to outside air, never into the roof cavity, with steam cleared by a run-on timer
15–20
Air changes per hour to aim for
In an apartment, a duct that exits through a shared wall or the facade needs scheme approval, another reason to settle ventilation at rough-in.
Strata / OC / CTS
05

Falls and drainage

Water leaves a bathroom floor by design, not luck. The screed under the tiles is graded so the general floor falls at about 1:80 to the floor waste and the shower floor at about 1:50, and that setout happens before tiling day.

Falls to wasteThe general floor grades gently to the waste; the shower floor falls harder inside the screen line
Centre floor waste
PositionIn the middle of the zone, with tiles graded to it from all sides
TilingSuits smaller tiles that can take compound falls
CostThe proven, cost-effective default
Linear drain
PositionA slot along the wall or screen line, one plane of fall
TilingLets large-format tiles run on a single fall
CostCosts more and needs exact setout
06

Niche and shower screens

A recessed niche keeps bottles off the floor without a shelf in the spray. Size it to the tile courses, one or two courses high and 300 to 600 mm wide, set between 900 and 1200 mm above the floor, and keep it out of external walls where possible. The screen then decides how open the room feels.

Recessed niche
Sized to the tile courses and waterproofed like the rest of the wall
Framed screen
The budget option; the frame hides silicone and forgives a wall that is slightly out
Semi-frameless screen
A framed perimeter with a frameless door; the middle path on cost
Frameless screen
Toughened panels on clips; the most open look, priced accordingly and needing exact setout
07

Bathroom lighting

Light the mirror, not just the ceiling

A single overhead downlight puts your face in shadow at the exact spot you shave or do makeup. Put task light at the mirror, wall lights either side at eye level or a quality LED mirror, and treat the downlights as the ambient layer. Specify 2700 to 3000 K throughout and a CRI of 90 or better at the mirror, where you judge skin tone.

Wet-area zones and IP ratings

The wiring rules divide a bathroom into zones around the shower and bath, and each zone limits what may be installed there. Fittings in and over the shower need a suitable ingress protection (IP) rating; confirm the rating with every fitting you select, and let your electrician map the zones at rough-in. The exhaust fan is part of the plan too, ducted outside, not into the roof cavity.

Wet-area zonesFittings in the spray zones need the right IP rating; the zones are mapped at rough-in
08

Bathroom in an apartment

Strata / OC / CTS

A bathroom above someone else's ceiling is the highest-liability room in a strata scheme, because a failed membrane travels down. Renovating one almost always needs scheme approval before work starts, with the waterproofing done by a licensed applicator and the certificate lodged with the owners corporation (OC) or body corporate.

Check the by-laws for acoustic conditions on pumps and pipework, confirm whether relocating fixtures counts as a major renovation, and build the approval time into the program before trades are booked.

Remember

Keep the waterproofing certificate and membrane photos with the owners corporation records. If a leak ever appears in the lot below, that paperwork decides who pays.
09

Brief your waterproofer

Waterproofing fails on shortcuts, not products. Put these four lines in writing:

The membrane system named in the quote, applied by a licensed waterproofer whose licence number is on it
Falls set out before screeding: about 1:80 on the general floor and 1:50 in the shower
Photos of the finished membrane and bond breakers before tiling, and the certificate at handover
The exhaust ducted outside and wired with a run-on timer
10

Common mistakes

Choosing fixtures before the layout and door swings are settled
Toilet in the direct line of sight from the door
Treating waterproofing as optional or rushing it before tiling
Poor 'falls to waste', so water pools instead of draining
Undersized or ceiling-only ventilation, so moisture and mould build up

Renovation Roadmap

Upgrade to unlock everything

Upgrade to the full Renovation Roadmap membership for the complete guide and full toolkit.

Complete renovation guide

Complete renovation guide

Nine stage-by-stage chapters that carry you through the whole build, from first plans to final handover.

Explore the renovation guide
Full toolkit

Full toolkit

Every checklist, template, and tracker you need to stay on top of cost, compliance, and trades.

See what is in the toolkit
See pricing and upgrade →
Important notice: This content provides general guidance only and does not constitute legal, financial, structural, or building advice. Requirements, regulations, approval processes, and building standards vary significantly between Australian states and territories and change over time. Verify all requirements with your state authority and engage licensed professionals for all certified works.